Results and export
Review snapshots for journals
Freeze the model, results, methods and data summary for journal reviewers.
How to
- 1Click Share, then the Review model tab.
- 2Under New snapshot, set a Label and Expires date and choose what to Include.
- 3Click Create snapshot (Run & create snapshot when analyses must run first). Review rounds lists every snapshot - click Copy link and send it to the reviewers.
- 4Open the link in a new tab to see reviewer mode: read-only Results, Model, Methods, Data summary and Syntax.
Loading demo
Good to know
- Put the link (Copy link in Review rounds) in the manuscript's data availability statement, usually after the Conclusion and before the References, or in the journal's submission-form field for it, and/or in the cover letter to the editor. List only the analyses your snapshot includes (e.g. CB-SEM instead of PLS-SEM). For example:
Data and analysis availability
For peer review only, the complete PLS-SEM output (measurement model, structural model, bootstrap results, moderation and conditional mediation analyses) is available through a confidential, read-only SEMGate review snapshot: https://semgate.net/review/<your-snapshot-id>. The link is intended solely for the editor and reviewers.
- Reviewers see a fixed anonymous title (Confidential manuscript) and an abstract snapshot line (date, SEMGate PLS/CB, short id) - not the Studio project name, and not your name or email. Keep snapshot labels neutral in your own Review rounds list (e.g. Round 1).
- Snapshots expire and can be revoked, so don't cite the link in the published article: in the accepted version, replace it with a permanent data availability statement (e.g. an OSF or Zenodo repository).